INSTALLATION: Ropeway system for the construction of a gas pipeline on Monte Botolino - Arezzo, Tuscany - with the placement of the pipeline.
EQUIPMENT: TopLine 1800 winch
Cargo Industry cart
Industry series equipment
LENGTH: 400 metres
CAPACITY: 5000 kg
INSTALLATION: Construction of a cableway ring system for transporting building materials for the restoration of the San Colombano hermitage built into the rock – Rovereto – Trentino
EQUIPMENT: LEW XS 2.2 kW electric winch
LEW S 2.2 kW electric winch
Blondin XS trolley
LENGTH: 150 metres
CAPACITY: 400 kg